Đầu mối liên hệ:

- Đối với đại biểu trong nước: Ông Đặng Huy Cường. ĐT (+84)913294698

- Đối với đại biểu quốc tế: Bà Hoàng Hương Giang. ĐT (+84)934413613

Contacts:

- Domestic delegations: Mr. Dang, Huy Cuong. Phone No. (+84)913294698

- International delegations: Ms. Hoang, Phuong Giang. Phone No. (+84)934413613

22
Industry and handicraft sector
A shipyard for steel fishing boats
Vung Ang Economic Zone

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: on the South side of Ha Tinh Province. - Location in the region/sub-region: Vung Ang Economic Zone, Ky Loi Commune, Ky Anh Town, Ha Tinh Province. - Distance from project site to airports, ports, highways, and national routes: Dong Hoi Airport (Quang Binh) is about 80 km to the South, and Vinh Airport (Nghe An) is about 120 km to the North; connecting to National Route 12C and associating with other areas via National Route 1A, Ho Chi Minh Road and Laos and Thailand through Chalo Border Gate; connecting to railway system through Vung Ang - Laos railway (to be constructed soon) and other transport systems such as North - South Expressway, seaway, etc. - Electricity and water supply are available for the project’s operation.

Investment objective/Investment eficiency: Construction of a shipyard for steel fishing boats with synchronous infrastructure and modern technology, providing fishing boats with different capacities to the domestic and international market; the construction of a steel shipyard in Vung Ang Economic Zone will create a basis and a foundation for the development of Vietnam’s fishing industry, contribute to the development of the marine economy, create jobs for local workers, and contribute to the state budget

Investment incentives: Be entitled to investment incentives for areas of extremely difficult socio-economic conditions

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 29.8 million dollar

Area: To be determined

Average salary: 8 - 10 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: Uncleared mixed-use land