Industry and handicraft sector
Other wind energy and solar energy projects
Per plans
Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: The land in coastal districts and the maritime area of Ha Tinh province following the conditions as prescribed
Investment objective/Investment eficiency: Construction of wind and solar energy plants to supply electricity to Vietnam’s power system through the medium voltage grid in Ha Tinh province; contributing to the distribution and assurance of electricity sources for production, business, and socio-economic development of the province and the region.
Investment incentives: To be determined
Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women
Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050
Total investment capital: 1,489.4 million dollar
Area: Per each project
Average salary: 6 - 8 million dongs per capita per month
Preliminary site clearance cost: To be determined
Land status: Uncleared mixed-use land