14
Industry and handicraft sector
Construction and business of infrastructure of the Northern Hong Linh industrial park
Hong Linh Town; (18.55398690414745, 105.68909388829903)

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: + Connecting to National Route 1A and other areas. + National coastal route: Connecting throughout from Cua Lo, Nghe An to Thien Cam National Tourist Area, Vung Ang Economic Zone and important economic areas of the province such as Ha Tinh City, Vung Ang Economic Zone, etc. - Vinh Airport (Nghe An) is 20 km to the North. - Seaway: Connecting sea routes with seaports in the province such as Vung Ang, Son Duong, Xuan Hai, and Xuan Hoi Port, domestically and internationally. - Electricity and water supply are available for the project’s operation.

Investment objective/Investment eficiency: Infrastructure construction and development of a synchronous, modern industrial park to ensure technical conditions, transport, water supply, drainage, and other necessities to attract and call secondary investors to invest and develop industry.

Investment incentives: To be determined

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 63,8 million dollar

Area: 269 ha

Average salary: 6 - 8 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: Uncleared mixed-use land, mainly agricultural land