Đầu mối liên hệ:

- Đối với đại biểu trong nước: Ông Đặng Huy Cường. ĐT (+84)913294698

- Đối với đại biểu quốc tế: Bà Hoàng Hương Giang. ĐT (+84)934413613

Contacts:

- Domestic delegations: Mr. Dang, Huy Cuong. Phone No. (+84)913294698

- International delegations: Ms. Hoang, Phuong Giang. Phone No. (+84)934413613

12
Industry and handicraft sector
Construction and business of infrastructure of Gia Lach industrial park
Xuan Vien Commune, Nghi Xuan District

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: the West of Ha Tinh Province. - Location in the region/sub-region: Xuan Vien Commune, Nghi Xuan District, Ha Tinh Province. - Distance from the project site to airports, ports, highways, and national routes: + Vinh Airport (Nghe An) is about 20 km to the North. + National Route 8B: mainly connecting to National Route 1A, East-West economic development axis. + Seaway: Connecting sea routes with seaports in the province such as Xuan Hai, Xuan Hoi, Vung Ang, and Son Duong Port. - Electricity and water supply are available for the project’s operation.

Investment objective/Investment eficiency: Infrastructure construction and development of a synchronous, modern industrial park to ensure technical conditions, transport, water supply, drainage, and other necessities to attract and call secondary investors to invest and develop industry in Gia Lach; creating favorable conditions for economic and social development of the locality and surrounding areas

Investment incentives: Be entitled to investment incentives for areas of difficult socio-economic conditions

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 42.6 ( million dollar)

Area: 200 - 300 ha

Average salary: 6 - 8 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: Uncleared land, mainly agricultural land