Đầu mối liên hệ:

- Đối với đại biểu trong nước: Ông Đặng Huy Cường. ĐT (+84)913294698

- Đối với đại biểu quốc tế: Bà Hoàng Hương Giang. ĐT (+84)934413613

Contacts:

- Domestic delegations: Mr. Dang, Huy Cuong. Phone No. (+84)913294698

- International delegations: Ms. Hoang, Phuong Giang. Phone No. (+84)934413613

13
Industry and handicraft sector
Construction and business of infrastructure of the Northern Thach Ha industrial park
Viet Tien and Thach Lien Commune, Thach Ha District

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: 5 km from the center of Ha Tinh City. + Connecting to National Route 1A and other regions. + National coastal route: Connecting throughout from Cua Lo, Nghe An to Thien Cam National Tourist Area, Vung Ang Economic Zone, and critical economic areas of the province such as Ha Tinh City. - Vinh Airport (Nghe An) is 45 km to the North. - Seaway: Connecting sea routes with seaports in the province such as Vung Ang, Son Duong, Xuan Hai, and Xuan Hoi Port, domestically and internationally. - Electricity and water supply are available for the project's operation.

Investment objective/Investment eficiency: Infrastructure construction of a synchronous, modern industrial park connecting with transport infrastructure, nearby urban and residential areas, providing cleared premises, attracting secondary domestic and international investors. Forming an industrial park in the North of Thach Ha District to contribute to structural transformation of the region’s economy and society, promoting the development of Thach Ha and Ha Tinh city’s urban areas.

Investment incentives: Be entitled to investment incentives for areas of difficult socio-economic conditions

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 85.1 (million dollar)

Area: 418 ha

Average salary: 6 - 8 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: Uncleared mixed-use land, mainly agricultural land