16
Industry and handicraft sector
Construction and business of infrastructure of Ha Vang industrial park
Can Loc District; 18.47415457999563, 105.76120740540219

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: 20 km from Ha Tinh City, 30 km from Vinh City. - Location in the region/sub-region: Can Loc District, Ha Tinh Province. - Distance from the project site to airports, seaports, expressways, and national routes: + Connecting to Vinh Airport (Nghe An) about 35 km to the North. + Directly connecting to National Route 1A, associating with National Route 8A and East-West development axis. + Seaway: Connecting sea routes with seaports in the province such as Xuan Hai, Xuan Hoi, Vung Ang, and Son Duong Port. - Electricity and water supply are available for the project’s operation.

Investment objective/Investment eficiency: Infrastructure construction and development of a synchronous, modern industrial park to ensure technical conditions, transport, water supply, drainage and other conditions to attract and call secondary investors to invest and develop industry. Connecting and accelerating the development of urban, residential, commercial and tourism infrastructure in Can Loc and surrounding areas. Contributing to the region’s structural transformation and state budget revenue.

Investment incentives: Be entitled to investment incentives for areas of difficult socio-economic conditions

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 42.6 ( million dollar)

Area: 100 ha

Average salary: 6 - 8 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: Uncleared mixed-use land, mainly agricultural land