Industry and handicraft sector
Mechanical engineering plant (dynamic equipment, lifting equipment)
Vung Ang Economic Zone (18.051139702416975, 106.36520299463032)
Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: on the South side of Ha Tinh Province. - Location in the region/sub-region: Vung Ang Economic Zone, Ky Loi Commune, Ky Anh Town, Ha Tinh Province. - Distance from project site to airports, ports, highways, and national routes: Dong Hoi Airport (Quang Binh) is about 80 km to the South, and Vinh Airport (Nghe An) is about 120 km to the North; connecting to National Route 12C and associating with other areas via National Route 1A, Ho Chi Minh Road and Laos and Thailand through Chalo Border Gate; connecting to railway system through Vung Ang - Laos railway (to be constructed soon) and other transport systems such as North - South Expressway, seaway, etc. - Electricity and water supply are available for the project’s operation.
Investment objective/Investment eficiency: Construction of a mechanical engineering plant to manufacture industrial machinery and equipment to serve the country's industry and agriculture by exploiting the advantages of raw materials available in Vung Ang Economic Zone and Son Duong - Vung Ang deep-water ports to facilitate the export and import of finished products to provinces and countries around the world. Accelerating the development of Vung Ang Economic Zone and contributing to forming a center for steelmaking and post-steel products.
Investment incentives: Be entitled to investment incentives for areas of extremely difficult socio-economic conditions
Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women
Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050
Total investment capital: 42.6 ( million dollar)
Area: To be determined
Average salary: 8 - 10 million dongs per capita per month
Preliminary site clearance cost: To be determined
Land status: Mixed-use land