Industry and handicraft sector
Construction and business of infrastructure of industrial parks in Vung Ang and Cau Treo International Border Gate Economic Zones
Vung Ang Economic Zone (18.051139702416975, 106.36520299463032), Cau Treo International Border Gate Economic Zone (18.45856694143532, 105.29782079493955)
Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Vung Ang Economic Zone Location in the province: Ky Anh Town, Ha Tinh Province. Electrical grid and clean water infrastructure foster the industrial development. + 80 km from Dong Hoi Airport (Quang Binh); + About 120 km from Vinh Airport (Nghe An); + Connecting to National Route 12C and associating with other areas via National Route 1A, Ho Chi Minh Road, Laos and Thailand via Chalo Border Gate. + Connecting to the railway system through Vung Ang - Laos railway (to be constructed soon) + Seaway: Connecting sea routes with seaports in the province such as Xuan Hai, Xuan Hoi, Vung Ang, and Son Duong Port. 2. Cau Treo International Border Gate Economic Zone: Location in the province: Huong Son District, Ha Tinh Province. + 80 km from Ha Tinh City, + 70 km west of Vinh City, Nghe An; + 150 km from Vung Ang - Son Duong Port; + Connecting to National Route 8A, Ho Chi Minh Road and associating with Laos, Thailand via Cau Treo International Border Gate. - Electricity and water supply are available for the project’s operation.
Investment objective/Investment eficiency: Infrastructure construction of synchronous, modern and standard industrial parks in the form of socialization to establish concentrated industrial parks with multi-sectors, attracting investment projects, contributing to structural transformation, and increase in income of working people and state budget revenue.
Investment incentives: Be entitled to investment incentives for areas of extremely difficult socio-economic conditions
Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women
Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050
Total investment capital: 127.7 (million dollar)
Area: To be determined; uncleared land
Average salary: 8 - 10 million dongs per capita per month
Preliminary site clearance cost: To be determined
Land status: Mixed-use land