28
Industry and handicraft sector
Exhibition Center in Ha Tinh City
Ha Tinh City (18.330350771936093, 105.88701079215885)

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: "Location in the province: The planning area to attract and call for the project is located on both sides of the railway and the expressway, between the provincial Road 550 and the extended Ham Nghi Road, near the urban area of Ha Tinh City. - Connecting to National Route 1A, National coastal route, National Route 15B and 8C. - Location in the region/sub-region: bordering Quang Binh, Nghe An. - Connecting to Vinh Airport, Nghe An and Dong Hoi Airport, Quang Binh through the road system. Distance from the project site to airports, seaports, expressways, national routes: Vinh Airport is 60 km to the North and Dong Hoi Airport is 150 km to the South. - Seaway: Connecting sea routes with seaports in the province such as Vung Ang, Son Duong, Xuan Hai, and Xuan Hoi Port, domestically and internationally. - Electricity and water supply are available for the project’s operation."

Investment objective/Investment eficiency: The project creates a highlight and a driving force for the development of Ha Tinh City. The Exhibition Center is also a place to organize the province’s political - economic - cultural events. Meeting the needs for recreation and leisure of Ha Tinh City’s people.

Investment incentives: .

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 21.3 million dollar

Area: 15-20 ha

Average salary: 6 - 8 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: Mixed-use land