08
Real estate sector
Ky Ninh Resort urban and sports area
Ky Ninh Commune, Ky Anh Town (18.12046099710363, 106.32586817466019)

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: located in the south of Ha Tinh Province, about 60 km from Ha Tinh City. - Distance from the project site to airports, ports, highways, and national routes: Dong Hoi airport (Quang Binh) is about 50 km to the south; Vinh airport (Nghe An) is about 120 km to the North; connecting to National Route 12C and associating with other areas via National Route 1A, Ho Chi Minh Road and Laos and Thailand via Chalo Border Gate, associating with railway system through Vung Ang - Laos railway (to be constructed soon) and other transport systems such as North - South expressway, waterway, etc. - Electricity and water supply are available for the project’s operation."

Investment objective/Investment eficiency: Construction of a resort urban and sports area with synchronous infrastructure and international standard services.

Investment incentives: Be entitled to investment incentives for areas of extremely difficult socio-economic conditions

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 63,8 (million dollars)

Area: To be determined

Average salary: 6 - 8 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: .