23
Industry and handicraft sector
Vung Ang III Liquefied Natural Gas (LNG) power plant
Vung Ang Economic Zone

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: on the South side of Ha Tinh Province. - Location in the region/sub-region: Vung Ang Economic Zone, Ky Loi Commune, Ky Anh Town, Ha Tinh Province. - Distance from project site to airports, ports, highways, and national routes: Dong Hoi Airport (Quang Binh) is about 80 km to the South, and Vinh Airport (Nghe An) is about 120 km to the North; connecting to National Route 12C and associating with other areas via National Route 1A, Ho Chi Minh Road and Laos and Thailand through Chalo Border Gate; connecting to railway system through Vung Ang - Laos railway (to be constructed soon) and other transport systems such as North - South Expressway, seaway, etc.

Investment objective/Investment eficiency: Construction of Vung Ang III Liquefied Natural Gas (LNG) power plant with a capacity of 4,500 MW to form a Power Center in Vung Ang Economic Zone as planned, contributing to ensuring national energy security, creating conditions to stimulate socio-economic development; as a foundation for the development of natural gas extraction, import and export industry

Investment incentives: Be entitled to investment incentives for areas of difficult socio-economic conditions

Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Total investment capital: 2,553.2 million dollar

Area: To be determined

Average salary: 8 - 10 million dongs per capita per month

Preliminary site clearance cost: To be determined

Land status: Mixed-use land