Commercial, service and tourism sector
Duc Tho logistics center
Duc Tho District (18.523722, 105.588653)
Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: on the west side of Ha Tinh Province. - Location in the region/sub-region: in Duc Tho District, Ha Tinh Province. - Distance from project site to airports, ports, highways, national routes: about 30 km from Vinh Airport (Nghe An); 120 km from Vung Ang and Son Duong Port; connecting to National Route 8A and associating with other areas via National Route 1A and Laos and the northeast region of Thailand. + Railway: 15 km of North - South railway goes through 02 stations, of which Yen Trung station is the primary station of Ha Tinh Province. - Electricity and water supply are available for the project’s operation.
Investment objective/Investment eficiency: Construction of general warehouse space for export and import, promoting the development of services and circulation of goods in the province through road routes such as National Route 8, North-South Expressway, etc.
Investment incentives: Be entitled to investment incentives for areas of difficult socio-economic conditions
Labor force: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women
Asessment of conformity with the plannings: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050
Total investment capital: 6.4 million dollar
Area: To be determined
Average salary: 6 - 8 million dongs per capita per month
Preliminary site clearance cost: To be determined
Land status: Mixed-use land