Đầu mối liên hệ:

- Đối với đại biểu trong nước: Ông Đặng Huy Cường. ĐT (+84)913294698

- Đối với đại biểu quốc tế: Bà Hoàng Hương Giang. ĐT (+84)934413613

Contacts:

- Domestic delegations: Mr. Dang, Huy Cuong. Phone No. (+84)913294698

- International delegations: Ms. Hoang, Phuong Giang. Phone No. (+84)934413613

15
Industry and handicraft sector
Construction and business of infrastructure of the Western Ha Tinh City industrial park
Thach Ha District;Infrastructure construction and development of a synchronous, modern industrial park to ensure technical conditions, transport, water supply, drainage, and other necessities to attract and call secondary investors to invest and develop industry; accelerating urbanization, mechanical growth in population to ensure the size of urban areas in association with the development of Ha Tinh City.

Transport infrastructure, electricity, and water supply in the project area; distance to the airport, seaport, railway, and road: Location in the province: The planning area to attract and call for investment is located on both sides of the railway and the expressway, between the provincial Road 550 and the extended Ham Nghi Road, near the urban area of Ha Tinh City. + National coastal route: Connecting throughout from Cua Lo, Nghe An to Thien Cam National Tourist Area, Vung Ang Economic Zone and critical economic areas of the province such as Ha Tinh City, etc. + National Route 15B passed through the city, acting as the main urban axis, the backbone for the whole city, road boundary B=62m, connecting the urban tourist areas and the coastal economy; + National Route 8C mainly connects with National Route 1A, East-West economic development axis, road boundary B=42m, inter-regional connection; + District Route 128 strengthens connection with National Route 1A and expressway in the future. The road boundary is 42m. - Location in the region/sub-region: bordering Quang Binh, Nghe An. - Connecting to Vinh airport, Nghe An and Dong Hoi Airport, Quang Binh through the road system. Distance from the project site to airports, seaports, expressways, and national routes: Vinh aiport is 100 km to the North and Dong Hoi airport is 200 km to the South. - Seaway: Connecting sea routes with seaports in the province such as Vung Ang, Son Duong, Xuan Hai, and Xuan Hoi Port, domestically and internationally. - Electricity and water supply are available for the project’s operation.

Investment objective/Investment eficiency: Infrastructure construction and development of a synchronous, modern industrial park to ensure technical conditions, transport, water supply, drainage, and other necessities to attract and call secondary investors to invest and develop industry; accelerating urbanization, mechanical growth in population to ensure the size of urban areas in association with the development of Ha Tinh City.

Investment incentives: In the first quarter of 2023, there were 521,589 people aged 15 and over in the labor force, with males accounting for 53.56% and females accounting for 46.44%. Of these, 22,422 people were unemployed, with approximately 10,360 men and 12,062 women

Labor force: Complying with the Ha Tinh Province’s Master planning scheme for 2021 - 2030 with a vision to 2050

Asessment of conformity with the plannings: 42.6 ( million dollar)

Total investment capital: 200 ha.

Area: 6 - 8 million dongs per capita per month

Average salary: To be determined

Preliminary site clearance cost: Uncleared mixed-use land, mainly agricultural land

Land status: Approval for both investment policy and investor